completed at West Avenue-10 and fire station road Total length of re-surfaced road - 550m

Подобни документи
GPI Document

GPI Document

GPI Document

unknown

GPI Document

PowerPoint Presentation

GPI Document

ECTS_IP_2006

unknown

r_AcademicCurriculum_BG

ECTS_IP_2006

r_AcademicCurriculum_BG

unknown

unknown

unknown

Сертификат за одобрение Настоящият сертификат се издава, за да удостовери, че Системата за управление на: Борика АД бул. Цар Борис III 41, 1612 София,

r_AcademicCurriculum_BG

32_CBC - Кратко Представяне

r_AcademicCurriculum_BG

r_AcademicCurriculum_BG

Annex to Certificate Анекс към Сертификат issued to / издаден на: Bio Aromatik EOOD / Био Ароматик ЕООД Date/ На дата: Summary

r_AcademicCurriculum_BG

unknown

Information Management

r_AcademicCurriculum_BG

Annex to Certificate issued to: Анекс към Сертификат издаден на: AVELANA 2016 LTD / Авелана 2016 ЕООД On На ANNEX OF

Sun, Protection, Design... Сенник тип ПЕРГОЛА Предназначение: Голям широкоплощен сенник за покриване на големи площадки. Конструкция: Здрава алуминиев

Вечеря. Програма на международен семинар "Изисквания на ЕС и обмен на добри практики гр. Видин, хотел Бонония г. (четвърт

r_AcademicCurriculum_BG

Препис:

February 2020

completed at West Avenue-10 and fire station road Total length of re-surfaced road - 550m

Under progress at West Lane 10, (Teknic Road) 95m completed

# Description Estimated value in Rs. 1 2 3 4 Providing and applying thermoplastic paint and installation of moulded shank for road hump, stop line, pedestrian crossing and stop marking in East Phase and West Phase of Electronics City Restoration of road and footpath for 66KV KPTCL cable laid portion in East Avenue 5 from Malgudi muss station to TESCOM, East Phase, Electronics City Construction of proposed footpath at the entrance of East Phase, Electronics City MS railing on footpath along West Avenue-6 (BHEL Jn to WIPRO Jn), Electronics City 23,71,000/- 11,29,000/- 13,25,000/- 28,75,000/-

# Description 1 Fabricating, supplying, and erection of 7-meter hot dip galvanized conical street light pole East and West phase, Electronics City Estimated value in Rs. Tender Opening date 23,18,000/- 10.03.2020 2 Supply of 4C X 16 Sq mm LT cable 6,92,813/- 12.03.2020 3 Conversion of 11 KV overhead line to 3C X 400 sq. mm UG cable. Conversion of existing 1x100 KVA, DTC on double pole structure to spun pole. Proposed 4-way DAS compact RMU, 5-Way DAS Compact RMU West Phase, Electronics City 61,93,010/- 12.03.2020 4 Hi-mast pedestrian work is in progress

# Description Estimated value in Rs. 1 2 3 4 5 MS railing on footpath along West Avenue-8 (Paramount Jn to Flextronics), West Phase, Electronics City Reconstruction of retaining wall near ISBR Business School, West Lane- 4, Electronics City Improvement of drain and footpath in West Avenue 4 from Momentive to ELCIA Complex, Electronics City Improvement of drain and footpath in West Avenue 10 from Gollahalli Jn to Fire station Jn, Electronics City Construction of 24m road, compound wall, retaining wall, culverts and allied services through Lab Zone area (Length : 880 mtrs) 27,28,000/- 1,79,000/- 32,40,000/- 21,00,000/- 10,00,00,000/- 6 Re-design and construction of Toll Plaza 5,00,00,000/-

Month Quantity Collected in Kg Dry Wet Reject Total Waste % dry % Wet % Reject Jan 67,859 56,579 41,277 1,65,715 40.95 34.14 24.91 Feb 68,112 62,198 38,954 1,69,264 40.24 36.75 23.01 # Companies added to SWM 1 Interplex 2 Project people 1,80,000 1,60,000 3 Fire station 4 Majestic Terrace 1,40,000 1,20,000 1,00,000 Reject # Companies added to sanitary services 80,000 60,000 40,000 Wet Dry 1 Infosys SEZ 2 DXC Technologies 20,000 0 Jan Feb

PMC finalized - Tide Technocrats Clearing of debris Clearing at KIDAB Land

Nursery Compost (Feb) Leaves collected 64,731kg Leaves composted 21,577kg Compost issued 300kg Plants distributed 331 Cutlery bank Utilization of 500 tumblers by Exa Termometrics and during Kanyathon (IFIM)

# Month Avg raw water Avg treated water Efficiency 1 8 KLD 159 152 95.5% 2 7 KLD 202 197 97.5% 3 9 KLD 252 185 62.6% 4 300 KLD 5,879 5,685 96.2% # STP loc Description of work Status 1 KSSIDC complex 450 septic tank Electrical panel repair & service Grundfos pump re-winding & installation Completed Completed 2 300 KLD STP Replacement raw sewage pump 2 star bush Complete

Usage Units Details Good 16 Low 3 Shantipura Police station WE School Issues 1 Under Fly Over (East Phase) - To be shifted shortly Total 20

Sustainable menstruation training - Women's Day SWM facility visit from Inventure Academy

Description Estate Shuttle Electrical Water Sewage Garbage Toilet Traffic Others Total Total tickets 1 27 1 1 1 31 Complaints 1 15 1 17 Request 12 1 1 14 Closed 1 27 1 1 1 In progress 31

Description Estate Shuttle Electrical Water Sewage Garbage Toilet Traffic Others Total Total tickets 3 30 2 1 36 Complaints 2 19 2 1 24 Request 1 11 12 Closed 2 30 2 1 1 In progress 1 35

Work done in Feb ON/OFF ability with dimming levels for street lights Cumulative power consumption, burn hours graph and reports on zone / streetlight wise Updated schedule customization for the upcoming days Set sensors (LUX & MOTION) through scheduler Goggle clustering for better visualization in zoom level also gives the count of streetlights in specified area Alerts system - number of faulty LEDs / gateway

POC for smart water meters successful Integration with CCC done for 2 gateways 25 smart meters installed at various companies 12 meters integrated to iconnect platform (daily water consumption being displayed in CCC) Integration of remaining 13 under progress 106 smart water meters to be installed in FY20-21

Installation of 50 ONT enclosures and OFC work completed 25 planned during Mar 2020 95 more to be installed in FY20-21

Support for events Conducting air quality measurement at Electronics City carried out by M.S. Ramaiah university of Applied Sciences Stellar Saturday conducted by Infosys Founders Day and Kanyathon by IFIM Vehicle procurement for CISF and traffic 2 Nos Bolero to replace old Gypsy/Bolero 3 Nos Motorcycle to replace old motorcycle for CISF 2 Nos of additional shuttle buses 2 Nos water tanker to replace old tankers 1 eauto for Estate / sustainability Approval required for 3 morchas Near Wipro Near BHEL Near XIME for CISF

Type Trips Users Distance covered (in km) Bicycle 24,560 8,603 51,234 E-scooter 59,112 13,543 912,403

Details Khatha Building license Commencement Certificate Occupancy Certificate FY 2019-20 (9 th March2020) 12 50 9 23 As on31st March 2019 86 147 49 69